Testability
Software testability is how easily, completely and conveniently a computer program can be tested.
Software engineers design a computer product, system or program keeping in mind the product testability. Good programmers are willing to do things that will help the testing process and a checklist of possible design points, features and so on can be useful in negotiating with them.
Here are the two main heuristics of software testing.
1. Visibility
2. Control
1.Visibility
Visibility is our ability to observe the states and outputs of the software under test. Features to improve the visibility are
• Access to Code
Developers must provide full access (source code, infrastructure, etc) to testers. The Code, change records and design documents should be provided to the testing team. The testing team should read and understand the code.
• Event logging
The events to log include User events, System milestones, Error handling and completed transactions. The logs may be stored in files, ring buffers in memory, and/or serial ports. Things to be logged include description of event, timestamp, subsystem, resource usage and severity of event. Logging should be adjusted by subsystem and type. Log file report internal errors, help in isolating defects, and give useful information about context, tests, customer usage and test coverage.
The more readable the Log Reports are, the easier it becomes to identify the defect cause and work towards corrective measures.
• Error detection mechanisms
Data integrity checking and System level error detection (e.g. Microsoft Appviewer) are useful here. In addition, Assertions and probes with the following features are really helpful
Code is added to detect internal errors.
Assertions abort on error.
Probes log errors.
Design by Contract theory---This technique requires that assertions be defined for functions. Preconditions apply to input and violations implicate calling functions while post-conditions apply to outputs and violations implicate called functions. This effectively solves the oracle problem for testing.
• Resource Monitoring
Memory usage should be monitored to find memory leaks. States of running methods, threads or processes should be watched (Profiling interfaces may be used for this.). In addition, the configuration values should be dumped. Resource monitoring is of particular concern in applications where the load on the application in real time is estimated to be considerable.
2.Control
Control refers to our ability to provide inputs and reach states in the software under test.
The features to improve controllability are:
• Test Points
Allow data to be inspected, inserted or modified at points in the software. It is especially useful for dataflow applications. In addition, a pipe and filters architecture provides many opportunities for test points.
• Custom User Interface controls
Custom UI controls often raise serious testability problems with GUI test drivers. Ensuring testability usually requires:
Adding methods to report necessary information
Customizing test tools to make use of these methods
Getting a tool expert to advise developers on testability and to build the required support.
Asking third party control vendors regarding support by test tools.
• Test Interfaces
Interfaces may be provided specifically for testing e.g. Excel and Xconq etc.
Existing interfaces may be able to support significant testing e.g. InstallSheild, AutoCAD, Tivoli, etc.
• Fault injection
Error seeding---instrumenting low level I/O code to simulate errors---makes it much easier to test error handling. It can be handled at both system and application level, Tivoli, etc.
• Installation and setup
Testers should be notified when installation has completed successfully. They should be able to verify installation, programmatically create sample records and run multiple clients, daemons or servers on a single machine.
A BROADER VIEW
Below are given a broader set of characteristics (usually known as James Bach heuristics) that lead to testable software.
Categories of Heuristics of software testing
•Operability
The better it works, the more efficiently it can be tested.
The system should have few bugs, no bugs should block the execution of tests and the product should evolve in functional stages (simultaneous development and testing).
•Observability
What we see is what we test.
Distinct output should be generated for each input
Current and past system states and variables should be visible during testing
All factors affecting the output should be visible.
Incorrect output should be easily identified.
Source code should be easily accessible.
Internal errors should be automatically detected (through self-testing mechanisms) and reported.
•Controllability
The better we control the software, the more the testing process can be automated and optimized.
Check that
All outputs can be generated and code can be executed through some combination of input.
Software and hardware states can be controlled directly by the test engineer.
Inputs and output formats are consistent and structured.
Test can be conveniently, specified, automated and reproduced.
•Decomposability
By controlling the scope of testing, we can quickly isolate problems and perform effective and efficient testing.
The software system should be built from independent modules which can be tested independently.
•Simplicity
The less there is to test, the more quickly we can test it.
The points to consider in this regard are functional (e.g. minimum set of features), structural (e.g. architecture is modularized) and code (e.g. a coding standard is adopted) simplicity.
•Stability
The fewer the changes, the fewer are the disruptions to testing.
The changes to software should be infrequent, controlled and not invalidating existing tests. The software should be able to recover well from failures.
•Understandability
The more information we will have, the smarter we will test.
The testers should be able to understand well the design, changes to the design and the dependencies between internal, external and shared components.
Technical documentation should be instantly accessible, accurate, well organized, specific and detailed.
•Suitability
The more we know about the intended use of the software, the better we can organize our testing to find important bugs.
The above heuristics can be used by a software engineer to develop a software configuration (i.e. program, data and documentation) that is convenient to test and verify.
Tuesday, July 15, 2008
Monday, July 14, 2008
Testing artifacts
Software testing process can produce several artifacts.
Test case
A test case is a software testing document, which consists of event, action, input, output, expected result, and actual result. Clinically defined a test case is an input and an expected result.[25] This can be as pragmatic as 'for condition x your derived result is y', whereas other test cases described in more detail the input scenario and what results might be expected. It can occasionally be a series of steps (but often steps are contained in a separate test procedure that can be exercised against multiple test cases, as a matter of economy) but with one expected result or expected outcome. The optional fields are a test case ID, test step or order of execution number, related requirement(s), depth, test category, author, and check boxes for whether the test is automatable and has been automated. Larger test cases may also contain prerequisite states or steps, and descriptions. A test case should also contain a place for the actual result. These steps can be stored in a word processor document, spreadsheet, database, or other common repository. In a database system, you may also be able to see past test results and who generated the results and the system configuration used to generate those results. These past results would usually be stored in a separate table.
Test script
The test script is the combination of a test case, test procedure, and test data. Initially the term was derived from the product of work created by automated regression test tools. Today, test scripts can be manual, automated, or a combination of both.
Test suite
The most common term for a collection of test cases is a test suite. The test suite often also contains more detailed instructions or goals for each collection of test cases. It definitely contains a section where the tester identifies the system configuration used during testing. A group of test cases may also contain prerequisite states or steps, and descriptions of the following tests.
Test plan
A test specification is called a test plan. The developers are well aware what test plans will be executed and this information is made available to the developers. This makes the developers more cautious when developing their code. This ensures that the developers code is not passed through any surprise test case or test plans.
Test harness
The software, tools, samples of data input and output, and configurations are all referred to collectively as a test harness.
In software testing, a test harness or automated test framework is a collection of software and test data configured to test a program unit by running it under varying conditions and monitor its behavior and outputs. It has two main parts: the test execution engine and the test script repository.
Test harnesses allow for the automation of tests. They can call functions with supplied parameters and print out and compare the results to the desired value. The test harness is a hook to the developed code, which can be tested using an automation framework.
A test harness should allow specific tests to run (this helps in optimising), orchestrate a runtime environment, and provide a capability to analyse results.
The typical objectives of a test harness are to:
* Automate the testing process.
* Execute test suites of test cases.
* Generate associated test reports.
A test harness typically provides the following benefits:
* Increased productivity due to automation of the testing process.
* Increased probability that regression testing will occur.
* Increased quality of software components and application.
Test case
A test case is a software testing document, which consists of event, action, input, output, expected result, and actual result. Clinically defined a test case is an input and an expected result.[25] This can be as pragmatic as 'for condition x your derived result is y', whereas other test cases described in more detail the input scenario and what results might be expected. It can occasionally be a series of steps (but often steps are contained in a separate test procedure that can be exercised against multiple test cases, as a matter of economy) but with one expected result or expected outcome. The optional fields are a test case ID, test step or order of execution number, related requirement(s), depth, test category, author, and check boxes for whether the test is automatable and has been automated. Larger test cases may also contain prerequisite states or steps, and descriptions. A test case should also contain a place for the actual result. These steps can be stored in a word processor document, spreadsheet, database, or other common repository. In a database system, you may also be able to see past test results and who generated the results and the system configuration used to generate those results. These past results would usually be stored in a separate table.
Test script
The test script is the combination of a test case, test procedure, and test data. Initially the term was derived from the product of work created by automated regression test tools. Today, test scripts can be manual, automated, or a combination of both.
Test suite
The most common term for a collection of test cases is a test suite. The test suite often also contains more detailed instructions or goals for each collection of test cases. It definitely contains a section where the tester identifies the system configuration used during testing. A group of test cases may also contain prerequisite states or steps, and descriptions of the following tests.
Test plan
A test specification is called a test plan. The developers are well aware what test plans will be executed and this information is made available to the developers. This makes the developers more cautious when developing their code. This ensures that the developers code is not passed through any surprise test case or test plans.
Test harness
The software, tools, samples of data input and output, and configurations are all referred to collectively as a test harness.
In software testing, a test harness or automated test framework is a collection of software and test data configured to test a program unit by running it under varying conditions and monitor its behavior and outputs. It has two main parts: the test execution engine and the test script repository.
Test harnesses allow for the automation of tests. They can call functions with supplied parameters and print out and compare the results to the desired value. The test harness is a hook to the developed code, which can be tested using an automation framework.
A test harness should allow specific tests to run (this helps in optimising), orchestrate a runtime environment, and provide a capability to analyse results.
The typical objectives of a test harness are to:
* Automate the testing process.
* Execute test suites of test cases.
* Generate associated test reports.
A test harness typically provides the following benefits:
* Increased productivity due to automation of the testing process.
* Increased probability that regression testing will occur.
* Increased quality of software components and application.
Test Report
A Test Report is a document that is prepared once the testing of a software product is complete and the delivery is to be made to the customer. This document would contain a summary of the entire project and would have to be presented in a way that any person who has not worked on the project would also get a good overview of the testing effort.
Contents of a Test Report
The contents of a test report are as follows:
Executive Summary
Overview
Application Overview
Testing Scope
Test Details
Test Approach
Types of testing conducted
Test Environment
Tools Used
Metrics
Test Results
Test Deliverables
Recommendations
These sections are explained as follows:
Executive Summary
This section would comprise of general information regarding the project, the client, the application, tools and people involved in such a way that it can be taken as a summary of the Test Report itself (i.e.) all the topics mentioned here would be elaborated in the various sections of the report.
1. Overview
This comprises of 2 sections – Application Overview and Testing Scope.
Application Overview – This would include detailed information on the application under test, the end users and a brief outline of the functionality as well.
Testing Scope – This would clearly outline the areas of the application that would / would not be tested by the QA team. This is done so that there would not be any misunderstandings between customer and QA as regards what needs to be tested and what does not need to be tested.
This section would also contain information of Operating System / Browser combinations if Compatibility testing is included in the testing effort.
2.Test Details
This section would contain the Test Approach, Types of Testing conducted, Test Environment and Tools Used.
Test Approach – This would discuss the strategy followed for executing the project. This could include information on how coordination was achieved between Onsite and Offshore teams, any innovative methods used for automation or for reducing repetitive workload on the testers, how information and daily / weekly deliverables were delivered to the client etc.
Types of testing conducted – This section would mention any specific types of testing performed (i.e.) Functional, Compatibility, Performance, Usability etc along with related specifications.
Test Environment – This would contain information on the Hardware and Software requirements for the project (i.e.) server configuration, client machine configuration, specific software installations required etc.
Tools used – This section would include information on any tools that were used for testing the project. They could be functional or performance testing automation tools, defect management tools, project tracking tools or any other tools which made the testing work easier.
3.Metrics
This section would include details on total number of test cases executed in the course of the project, number of defects found etc. Calculations like defects found per test case or number of test cases executed per day per person etc would also be entered in this section. This can be used in calculating the efficiency of the testing effort.
4.Test Results
This section is similar to the Metrics section, but is more for showcasing the salient features of the testing effort. Incase many defects have been logged for the project, graphs can be generated accordingly and depicted in this section. The graphs can be for Defects per build, Defects based on severity, Defects based on Status (i.e.) how many were fixed and how many rejected etc.
5.Test Deliverables
This section would include links to the various documents prepared in the course of the testing project (i.e.) Test Plan, Test Procedures, Test Logs, Release Report etc.
6.Recommendations
This section would include any recommendations from the QA team to the client on the product tested. It could also mention the list of known defects which have been logged by QA but not yet fixed by the development team so that they can be taken care of in the next release of the application.
Contents of a Test Report
The contents of a test report are as follows:
Executive Summary
Overview
Application Overview
Testing Scope
Test Details
Test Approach
Types of testing conducted
Test Environment
Tools Used
Metrics
Test Results
Test Deliverables
Recommendations
These sections are explained as follows:
Executive Summary
This section would comprise of general information regarding the project, the client, the application, tools and people involved in such a way that it can be taken as a summary of the Test Report itself (i.e.) all the topics mentioned here would be elaborated in the various sections of the report.
1. Overview
This comprises of 2 sections – Application Overview and Testing Scope.
Application Overview – This would include detailed information on the application under test, the end users and a brief outline of the functionality as well.
Testing Scope – This would clearly outline the areas of the application that would / would not be tested by the QA team. This is done so that there would not be any misunderstandings between customer and QA as regards what needs to be tested and what does not need to be tested.
This section would also contain information of Operating System / Browser combinations if Compatibility testing is included in the testing effort.
2.Test Details
This section would contain the Test Approach, Types of Testing conducted, Test Environment and Tools Used.
Test Approach – This would discuss the strategy followed for executing the project. This could include information on how coordination was achieved between Onsite and Offshore teams, any innovative methods used for automation or for reducing repetitive workload on the testers, how information and daily / weekly deliverables were delivered to the client etc.
Types of testing conducted – This section would mention any specific types of testing performed (i.e.) Functional, Compatibility, Performance, Usability etc along with related specifications.
Test Environment – This would contain information on the Hardware and Software requirements for the project (i.e.) server configuration, client machine configuration, specific software installations required etc.
Tools used – This section would include information on any tools that were used for testing the project. They could be functional or performance testing automation tools, defect management tools, project tracking tools or any other tools which made the testing work easier.
3.Metrics
This section would include details on total number of test cases executed in the course of the project, number of defects found etc. Calculations like defects found per test case or number of test cases executed per day per person etc would also be entered in this section. This can be used in calculating the efficiency of the testing effort.
4.Test Results
This section is similar to the Metrics section, but is more for showcasing the salient features of the testing effort. Incase many defects have been logged for the project, graphs can be generated accordingly and depicted in this section. The graphs can be for Defects per build, Defects based on severity, Defects based on Status (i.e.) how many were fixed and how many rejected etc.
5.Test Deliverables
This section would include links to the various documents prepared in the course of the testing project (i.e.) Test Plan, Test Procedures, Test Logs, Release Report etc.
6.Recommendations
This section would include any recommendations from the QA team to the client on the product tested. It could also mention the list of known defects which have been logged by QA but not yet fixed by the development team so that they can be taken care of in the next release of the application.
TEST PLAN
1.What is a Test Plan?
A Test Plan can be defined as a document that describes the scope, approach, resources and schedule of intended test activities. It identifies test items, the features to be tested, the testing tasks, who will do each task, and any risks requiring contingency planning.
The main purpose of preparing a Test Plan is that everyone concerned with the project are in sync with regards to the scope, responsibilities, deadlines and deliverables for the project. It is in this respect that reviews and a sign-off are very important since it means that everyone is in agreement of the contents of the test plan and this also helps in case of any dispute during the course of the project (especially between the developers and the testers).
Purpose of preparing a Test Plan
A Test Plan is a useful way to think through the efforts needed to validate the acceptability of a software product.
The completed document will help people outside the test group understand the 'why' and 'how' of product validation.
It should be thorough enough to be useful but not so thorough that no one outside the test group will read it.
Contents of a Test Plan
1. Purpose
2. Scope
3. Test Approach
4. Entry Criteria
5. Resources
6. Tasks / Responsibilities
7. Exit Criteria
8. Schedules / Milestones
9. Hardware / Software Requirements
10. Risks & Mitigation Plans
11. Tools to be used
12. Deliverables
13. References
a. Procedures
b. Templates
c. Standards/Guidelines
14. Annexure
15. Sign-Off
2. Contents (in detail)
Purpose
This section should contain the purpose of preparing the test plan.
Scope
This section should talk about the areas of the application which are to be tested by the QA team and specify those areas which are definitely out of scope (screens, database, mainframe processes etc).
Test Approach
This would contain details on how the testing is to be performed and whether any specific strategy is to be followed (including configuration management).
Entry Criteria
This section explains the various steps to be performed before the start of a test (i.e.) pre-requisites. For example: Timely environment set up, starting the web server / app server, successful implementation of the latest build etc.
Resources
This section should list out the people who would be involved in the project and their designation etc.
Tasks / Responsibilities
This section talks about the tasks to be performed and the responsibilities assigned to the various members in the project.
Exit criteria
Contains tasks like bringing down the system / server, restoring system to pre-test environment, database refresh etc.
Schedules / Milestones
This sections deals with the final delivery date and the various milestone dates to be met in the course of the project.
Hardware / Software Requirements
This section would contain the details of PC’s / servers required (with the configuration) to install the application or perform the testing; specific software that needs to be installed on the systems to get the application running or to connect to the database; connectivity related issues etc.
Risks & Mitigation Plans
This section should list out all the possible risks that can arise during the testing and the mitigation plans that the QA team plans to implement incase the risk actually turns into a reality.
Tools to be used
This would list out the testing tools or utilities (if any) that are to be used in the project (e.g.) WinRunner, Test Director, PCOM, WinSQL.
Deliverables
This section contains the various deliverables that are due to the client at various points of time (i.e.) daily, weekly, start of the project, end of the project etc. These could include Test Plans, Test Procedure, Test Matrices, Status Reports, Test Scripts etc. Templates for all these could also be attached.
References
Procedures
Templates (Client Specific or otherwise)
Standards / Guidelines (e.g.) QView
Project related documents (RSD, ADD, FSD etc)
Annexure
This could contain embedded documents or links to documents which have been / will be used in the course of testing (e.g.) templates used for reports, test cases etc. Referenced documents can also be attached here.
Sign-Off
This should contain the mutual agreement between the client and the QA team with both leads / managers signing off their agreement on the Test Plan.
A Test Plan can be defined as a document that describes the scope, approach, resources and schedule of intended test activities. It identifies test items, the features to be tested, the testing tasks, who will do each task, and any risks requiring contingency planning.
The main purpose of preparing a Test Plan is that everyone concerned with the project are in sync with regards to the scope, responsibilities, deadlines and deliverables for the project. It is in this respect that reviews and a sign-off are very important since it means that everyone is in agreement of the contents of the test plan and this also helps in case of any dispute during the course of the project (especially between the developers and the testers).
Purpose of preparing a Test Plan
A Test Plan is a useful way to think through the efforts needed to validate the acceptability of a software product.
The completed document will help people outside the test group understand the 'why' and 'how' of product validation.
It should be thorough enough to be useful but not so thorough that no one outside the test group will read it.
Contents of a Test Plan
1. Purpose
2. Scope
3. Test Approach
4. Entry Criteria
5. Resources
6. Tasks / Responsibilities
7. Exit Criteria
8. Schedules / Milestones
9. Hardware / Software Requirements
10. Risks & Mitigation Plans
11. Tools to be used
12. Deliverables
13. References
a. Procedures
b. Templates
c. Standards/Guidelines
14. Annexure
15. Sign-Off
2. Contents (in detail)
Purpose
This section should contain the purpose of preparing the test plan.
Scope
This section should talk about the areas of the application which are to be tested by the QA team and specify those areas which are definitely out of scope (screens, database, mainframe processes etc).
Test Approach
This would contain details on how the testing is to be performed and whether any specific strategy is to be followed (including configuration management).
Entry Criteria
This section explains the various steps to be performed before the start of a test (i.e.) pre-requisites. For example: Timely environment set up, starting the web server / app server, successful implementation of the latest build etc.
Resources
This section should list out the people who would be involved in the project and their designation etc.
Tasks / Responsibilities
This section talks about the tasks to be performed and the responsibilities assigned to the various members in the project.
Exit criteria
Contains tasks like bringing down the system / server, restoring system to pre-test environment, database refresh etc.
Schedules / Milestones
This sections deals with the final delivery date and the various milestone dates to be met in the course of the project.
Hardware / Software Requirements
This section would contain the details of PC’s / servers required (with the configuration) to install the application or perform the testing; specific software that needs to be installed on the systems to get the application running or to connect to the database; connectivity related issues etc.
Risks & Mitigation Plans
This section should list out all the possible risks that can arise during the testing and the mitigation plans that the QA team plans to implement incase the risk actually turns into a reality.
Tools to be used
This would list out the testing tools or utilities (if any) that are to be used in the project (e.g.) WinRunner, Test Director, PCOM, WinSQL.
Deliverables
This section contains the various deliverables that are due to the client at various points of time (i.e.) daily, weekly, start of the project, end of the project etc. These could include Test Plans, Test Procedure, Test Matrices, Status Reports, Test Scripts etc. Templates for all these could also be attached.
References
Procedures
Templates (Client Specific or otherwise)
Standards / Guidelines (e.g.) QView
Project related documents (RSD, ADD, FSD etc)
Annexure
This could contain embedded documents or links to documents which have been / will be used in the course of testing (e.g.) templates used for reports, test cases etc. Referenced documents can also be attached here.
Sign-Off
This should contain the mutual agreement between the client and the QA team with both leads / managers signing off their agreement on the Test Plan.
Tuesday, July 8, 2008
Specific Field Tests
1.Date Field Checks
1. Assure that leap years are validated correctly & do not cause errors/miscalculations.
2. Assure that month code 00 and 13 are validated correctly & do not cause errors/miscalculations.
3. Assure that 00 and 13 are reported as errors.
4. Assure that day values 00 and 32 are validated correctly & do not cause errors/miscalculations.
5. Assure that Feb. 28, 29, 30 are validated correctly & do not cause errors/ miscalculations.
6. Assure that Feb. 30 is reported as an error.
7. Assure that century change is validated correctly & does not cause errors/ miscalculations.
8. Assure that out of cycle dates are validated correctly & do not cause errors/miscalculations.
2.Numeric Fields
1. Assure that lowest and highest values are handled correctly.
2. Assure that invalid values are logged and reported.
3. Assure that valid values are handles by the correct procedure.
4. Assure that numeric fields with a blank in position 1 are processed or reported as an error.
5. Assure that fields with a blank in the last position are processed or reported as an error an error.
6. Assure that both + and - values are correctly processed.
7. Assure that division by zero does not occur.
8. Include value zero in all calculations.
9. Include at least one in-range value.
10. Include maximum and minimum range values.
11. Include out of range values above the maximum and below the minimum.
12. Assure that upper and lower values in ranges are handled correctly.
3.Alpha Field Checks
1. Use blank and non-blank data.
2. Include lowest and highest values.
3. Include invalid characters & symbols.
4. Include valid characters.
5. Include data items with first position blank.
6. Include data items with last position blank.
1. Assure that leap years are validated correctly & do not cause errors/miscalculations.
2. Assure that month code 00 and 13 are validated correctly & do not cause errors/miscalculations.
3. Assure that 00 and 13 are reported as errors.
4. Assure that day values 00 and 32 are validated correctly & do not cause errors/miscalculations.
5. Assure that Feb. 28, 29, 30 are validated correctly & do not cause errors/ miscalculations.
6. Assure that Feb. 30 is reported as an error.
7. Assure that century change is validated correctly & does not cause errors/ miscalculations.
8. Assure that out of cycle dates are validated correctly & do not cause errors/miscalculations.
2.Numeric Fields
1. Assure that lowest and highest values are handled correctly.
2. Assure that invalid values are logged and reported.
3. Assure that valid values are handles by the correct procedure.
4. Assure that numeric fields with a blank in position 1 are processed or reported as an error.
5. Assure that fields with a blank in the last position are processed or reported as an error an error.
6. Assure that both + and - values are correctly processed.
7. Assure that division by zero does not occur.
8. Include value zero in all calculations.
9. Include at least one in-range value.
10. Include maximum and minimum range values.
11. Include out of range values above the maximum and below the minimum.
12. Assure that upper and lower values in ranges are handled correctly.
3.Alpha Field Checks
1. Use blank and non-blank data.
2. Include lowest and highest values.
3. Include invalid characters & symbols.
4. Include valid characters.
5. Include data items with first position blank.
6. Include data items with last position blank.
Screen Validation Checklist
1.Aesthetic Conditions:
1. Is the general screen background the correct color?
2. Are the field prompts the correct color?
3. Are the field backgrounds the correct color?
4. In read-only mode, are the field prompts the correct color?
5. In read-only mode, are the field backgrounds the correct color?
6. Are all the screen prompts specified in the correct screen font?
7. Is the text in all fields specified in the correct screen font?
8. Are all the field prompts aligned perfectly on the screen?
9. Are all the field edit boxes aligned perfectly on the screen?
10. Are all group boxes aligned correctly on the screen?
11. Should the screen be resizable?
12. Should the screen be allowed to minimize?
13. Are all the field prompts spelt correctly?
14. Are all character or alphanumeric fields left justified? This is the default unless otherwise specified.
15. Are all numeric fields right justified? This is the default unless otherwise specified.
16. Is all the micro-help text spelt correctly on this screen?
17. Is all the error message text spelt correctly on this screen?
18. Is all user input captured in UPPER case or lowercase consistently?
19. Where the database requires a value (other than null) then this should be defaulted into fields. The user must either enter an alternative valid value or leave the default value intact.
20. Assure that all windows have a consistent look and feel.
21. Assure that all dialog boxes have a consistent look and feel.
2.Validation Conditions:
1. Does a failure of validation on every field cause a sensible user error message?
2. Is the user required to fix entries, which have failed validation tests?
3. Have any fields got multiple validation rules and if so are all rules being applied?
4. If the user enters an invalid value and clicks on the OK button (i.e. does not TAB off the field) is the invalid entry identified and highlighted correctly with an error message?
5. Is validation consistently applied at screen level unless specifically required at field level?
6. For all numeric fields check whether negative numbers can and should be able to be entered.
7. For all numeric fields check the minimum and maximum values and also some mid-range values allowable?
8. For all character/alphanumeric fields check the field to ensure that there is a character limit specified and that this limit is exactly correct for the specified database size?
9. Do all mandatory fields require user input?
10. If any of the database columns don't allow null values then the corresponding screen fields must be mandatory. (If any field, which initially was mandatory, has become optional then check whether null values are allowed in this field.)
3.Navigation Conditions:
1. Can the screen be accessed correctly from the menu?
2. Can the screen be accessed correctly from the toolbar?
3. Can the screen be accessed correctly by double clicking on a list control on the previous screen?
4. Can all screens accessible via buttons on this screen be accessed correctly?
5. Can all screens accessible by double clicking on a list control be accessed correctly?
6. Is the screen modal? (i.e.) Is the user prevented from accessing other functions when this screen is active and is this correct?
7. Can a number of instances of this screen be opened at the same time and is this correct?
4.Usability Conditions:
1. Are all the dropdowns on this screen sorted correctly? Alphabetic sorting is the default unless otherwise specified.
2. Is all date entry required in the correct format?
3. Have all pushbuttons on the screen been given appropriate Shortcut keys?
4. Do the Shortcut keys work correctly?
5. Have the menu options that apply to your screen got fast keys associated and should they have?
6. Does the Tab Order specified on the screen go in sequence from Top Left to bottom right? This is the default unless otherwise specified.
7. Are all read-only fields avoided in the TAB sequence?
8. Are all disabled fields avoided in the TAB sequence?
9. Can the cursor be placed in the microhelp text box by clicking on the text box with the mouse?
10. Can the cursor be placed in read-only fields by clicking in the field with the mouse?
11. Is the cursor positioned in the first input field or control when the screen is opened?
12. Is there a default button specified on the screen?
13. Does the default button work correctly?
14. When an error message occurs does the focus return to the field in error when the user cancels it?
15. When the user Alt+Tab's to another application does this have any impact on the screen upon return to the application?
16. Do all the fields edit boxes indicate the number of characters they will hold by there length? e.g. a 30 character field should be a lot longer.
5.Data Integrity Conditions:
1. Is the data saved when the window is closed by double clicking on the close box?
2. Check the maximum field lengths to ensure that there are no truncated characters?
3. Where the database requires a value (other than null) then this should be defaulted into fields. The user must either enter an alternative valid value or leave the default value intact.
4. Check maximum and minimum field values for numeric fields?
5. If numeric fields accept negative values can these be stored correctly on the database and does it make sense for the field to accept negative numbers?
6. If a set of radio buttons represents a fixed set of values such as A, B and C then what happens if a blank value is retrieved from the database? (In some situations rows can be created on the database by other functions, which are not screen based, and thus the required initial values can be incorrect.)
7. If a particular set of data is saved to the database check that each value gets saved fully to the database. (i.e.) Beware of truncation (of strings) and rounding of numeric values.
6.Modes (Editable Read-only) Conditions:
1. Are the screen and field colors adjusted correctly for read-only mode?
2. Should a read-only mode be provided for this screen?
3. Are all fields and controls disabled in read-only mode?
4. Can the screen be accessed from the previous screen/menu/toolbar in read-only mode?
5. Can all screens available from this screen be accessed in read-only mode?
6. Check that no validation is performed in read-only mode.
7.General Conditions:
1. Assure the existence of the "Help" menu.
2. Assure that the proper commands and options are in each menu.
3. Assure that all buttons on all tool bars have a corresponding key commands.
4. Assure that each menu command has an alternative (hot-key) key sequence, which will invoke it where appropriate.
5. In drop down list boxes, ensure that the names are not abbreviations / cut short
6. In drop down list boxes, assure that the list and each entry in the list can be accessed via appropriate key / hot key combinations.
7. Ensure that duplicate hot keys do not exist on each screen
8. Ensure the proper usage of the escape key (which is to undo any changes that have been made) and generates a caution message "Changes will be lost - Continue yes/no"
9. Assure that the cancel button functions the same as the escape key.
10. Assure that the Cancel button operates, as a Close button when changes have been made that cannot be undone.
11. Assure that only command buttons, which are used by a particular window, or in a particular dialog box, are present. – (i.e) make sure they don't work on the screen behind the current screen.
12. When a command button is used sometimes and not at other times, assures that it is grayed out when it should not be used.
13. Assure that OK and Cancel buttons are grouped separately from other command buttons.
14. Assure that command button names are not abbreviations.
15. Assure that all field labels/names are not technical labels, but rather are names meaningful to system users.
16. Assure that command buttons are all of similar size and shape, and same font & font size.
17. Assure that each command button can be accessed via a hot key combination.
18. Assure that command buttons in the same window/dialog box do not have duplicate hot keys.
19. Assure that each window/dialog box has a clearly marked default value (command button, or other object) which is invoked when the Enter key is pressed - and NOT the Cancel or Close button
20. Assure that focus is set to an object/button, which makes sense according to the function of the window/dialog box.
21. Assure that all option buttons (and radio buttons) names are not abbreviations.
22. Assure that option button names are not technical labels, but rather are names meaningful to system users.
23. If hot keys are used to access option buttons, assure that duplicate hot keys do not exist in the same window/dialog box.
24. Assure that option box names are not abbreviations.
25. Assure that option boxes, option buttons, and command buttons are logically grouped together in clearly demarcated areas "Group Box"
26. Assure that the Tab key sequence, which traverses the screens, does so in a logical way.
27. Assure consistency of mouse actions across windows.
28. Assure that the color red is not used to highlight active objects (many individuals are red-green color blind).
29. Assure that the user will have control of the desktop with respect to general color and highlighting (the application should not dictate the desktop background characteristics).
30. Assure that the screen/window does not have a cluttered appearance
31. Ctrl + F6 opens next tab within tabbed window
32. Shift + Ctrl + F6 opens previous tab within tabbed window
33. Tabbing will open next tab within tabbed window if on last field of current tab
34. Tabbing will go onto the 'Continue' button if on last field of last tab within tabbed window
35. Tabbing will go onto the next editable field in the window
36. Banner style & size & display exact same as existing windows
37. If 8 or less options in a list box, display all options on open of list box - should be no need to scroll
38. Errors on continue will cause user to be returned to the tab and the focus should be on the field causing the error. (i.e the tab is opened, highlighting the field with the error on it)
39. Pressing continue while on the first tab of a tabbed window (assuming all fields filled correctly) will not open all the tabs.
40. On open of tab focus will be on first editable field
41. All fonts to be the same
42. Alt+F4 will close the tabbed window and return you to main screen or previous screen (as appropriate), generating "changes will be lost" message if necessary.
43. Microhelp text for every enabled field & button
44. Ensure all fields are disabled in read-only mode
45. Progress messages on load of tabbed screens
46. Return operates continue
47. If retrieve on load of tabbed window fails window should not open
1. Is the general screen background the correct color?
2. Are the field prompts the correct color?
3. Are the field backgrounds the correct color?
4. In read-only mode, are the field prompts the correct color?
5. In read-only mode, are the field backgrounds the correct color?
6. Are all the screen prompts specified in the correct screen font?
7. Is the text in all fields specified in the correct screen font?
8. Are all the field prompts aligned perfectly on the screen?
9. Are all the field edit boxes aligned perfectly on the screen?
10. Are all group boxes aligned correctly on the screen?
11. Should the screen be resizable?
12. Should the screen be allowed to minimize?
13. Are all the field prompts spelt correctly?
14. Are all character or alphanumeric fields left justified? This is the default unless otherwise specified.
15. Are all numeric fields right justified? This is the default unless otherwise specified.
16. Is all the micro-help text spelt correctly on this screen?
17. Is all the error message text spelt correctly on this screen?
18. Is all user input captured in UPPER case or lowercase consistently?
19. Where the database requires a value (other than null) then this should be defaulted into fields. The user must either enter an alternative valid value or leave the default value intact.
20. Assure that all windows have a consistent look and feel.
21. Assure that all dialog boxes have a consistent look and feel.
2.Validation Conditions:
1. Does a failure of validation on every field cause a sensible user error message?
2. Is the user required to fix entries, which have failed validation tests?
3. Have any fields got multiple validation rules and if so are all rules being applied?
4. If the user enters an invalid value and clicks on the OK button (i.e. does not TAB off the field) is the invalid entry identified and highlighted correctly with an error message?
5. Is validation consistently applied at screen level unless specifically required at field level?
6. For all numeric fields check whether negative numbers can and should be able to be entered.
7. For all numeric fields check the minimum and maximum values and also some mid-range values allowable?
8. For all character/alphanumeric fields check the field to ensure that there is a character limit specified and that this limit is exactly correct for the specified database size?
9. Do all mandatory fields require user input?
10. If any of the database columns don't allow null values then the corresponding screen fields must be mandatory. (If any field, which initially was mandatory, has become optional then check whether null values are allowed in this field.)
3.Navigation Conditions:
1. Can the screen be accessed correctly from the menu?
2. Can the screen be accessed correctly from the toolbar?
3. Can the screen be accessed correctly by double clicking on a list control on the previous screen?
4. Can all screens accessible via buttons on this screen be accessed correctly?
5. Can all screens accessible by double clicking on a list control be accessed correctly?
6. Is the screen modal? (i.e.) Is the user prevented from accessing other functions when this screen is active and is this correct?
7. Can a number of instances of this screen be opened at the same time and is this correct?
4.Usability Conditions:
1. Are all the dropdowns on this screen sorted correctly? Alphabetic sorting is the default unless otherwise specified.
2. Is all date entry required in the correct format?
3. Have all pushbuttons on the screen been given appropriate Shortcut keys?
4. Do the Shortcut keys work correctly?
5. Have the menu options that apply to your screen got fast keys associated and should they have?
6. Does the Tab Order specified on the screen go in sequence from Top Left to bottom right? This is the default unless otherwise specified.
7. Are all read-only fields avoided in the TAB sequence?
8. Are all disabled fields avoided in the TAB sequence?
9. Can the cursor be placed in the microhelp text box by clicking on the text box with the mouse?
10. Can the cursor be placed in read-only fields by clicking in the field with the mouse?
11. Is the cursor positioned in the first input field or control when the screen is opened?
12. Is there a default button specified on the screen?
13. Does the default button work correctly?
14. When an error message occurs does the focus return to the field in error when the user cancels it?
15. When the user Alt+Tab's to another application does this have any impact on the screen upon return to the application?
16. Do all the fields edit boxes indicate the number of characters they will hold by there length? e.g. a 30 character field should be a lot longer.
5.Data Integrity Conditions:
1. Is the data saved when the window is closed by double clicking on the close box?
2. Check the maximum field lengths to ensure that there are no truncated characters?
3. Where the database requires a value (other than null) then this should be defaulted into fields. The user must either enter an alternative valid value or leave the default value intact.
4. Check maximum and minimum field values for numeric fields?
5. If numeric fields accept negative values can these be stored correctly on the database and does it make sense for the field to accept negative numbers?
6. If a set of radio buttons represents a fixed set of values such as A, B and C then what happens if a blank value is retrieved from the database? (In some situations rows can be created on the database by other functions, which are not screen based, and thus the required initial values can be incorrect.)
7. If a particular set of data is saved to the database check that each value gets saved fully to the database. (i.e.) Beware of truncation (of strings) and rounding of numeric values.
6.Modes (Editable Read-only) Conditions:
1. Are the screen and field colors adjusted correctly for read-only mode?
2. Should a read-only mode be provided for this screen?
3. Are all fields and controls disabled in read-only mode?
4. Can the screen be accessed from the previous screen/menu/toolbar in read-only mode?
5. Can all screens available from this screen be accessed in read-only mode?
6. Check that no validation is performed in read-only mode.
7.General Conditions:
1. Assure the existence of the "Help" menu.
2. Assure that the proper commands and options are in each menu.
3. Assure that all buttons on all tool bars have a corresponding key commands.
4. Assure that each menu command has an alternative (hot-key) key sequence, which will invoke it where appropriate.
5. In drop down list boxes, ensure that the names are not abbreviations / cut short
6. In drop down list boxes, assure that the list and each entry in the list can be accessed via appropriate key / hot key combinations.
7. Ensure that duplicate hot keys do not exist on each screen
8. Ensure the proper usage of the escape key (which is to undo any changes that have been made) and generates a caution message "Changes will be lost - Continue yes/no"
9. Assure that the cancel button functions the same as the escape key.
10. Assure that the Cancel button operates, as a Close button when changes have been made that cannot be undone.
11. Assure that only command buttons, which are used by a particular window, or in a particular dialog box, are present. – (i.e) make sure they don't work on the screen behind the current screen.
12. When a command button is used sometimes and not at other times, assures that it is grayed out when it should not be used.
13. Assure that OK and Cancel buttons are grouped separately from other command buttons.
14. Assure that command button names are not abbreviations.
15. Assure that all field labels/names are not technical labels, but rather are names meaningful to system users.
16. Assure that command buttons are all of similar size and shape, and same font & font size.
17. Assure that each command button can be accessed via a hot key combination.
18. Assure that command buttons in the same window/dialog box do not have duplicate hot keys.
19. Assure that each window/dialog box has a clearly marked default value (command button, or other object) which is invoked when the Enter key is pressed - and NOT the Cancel or Close button
20. Assure that focus is set to an object/button, which makes sense according to the function of the window/dialog box.
21. Assure that all option buttons (and radio buttons) names are not abbreviations.
22. Assure that option button names are not technical labels, but rather are names meaningful to system users.
23. If hot keys are used to access option buttons, assure that duplicate hot keys do not exist in the same window/dialog box.
24. Assure that option box names are not abbreviations.
25. Assure that option boxes, option buttons, and command buttons are logically grouped together in clearly demarcated areas "Group Box"
26. Assure that the Tab key sequence, which traverses the screens, does so in a logical way.
27. Assure consistency of mouse actions across windows.
28. Assure that the color red is not used to highlight active objects (many individuals are red-green color blind).
29. Assure that the user will have control of the desktop with respect to general color and highlighting (the application should not dictate the desktop background characteristics).
30. Assure that the screen/window does not have a cluttered appearance
31. Ctrl + F6 opens next tab within tabbed window
32. Shift + Ctrl + F6 opens previous tab within tabbed window
33. Tabbing will open next tab within tabbed window if on last field of current tab
34. Tabbing will go onto the 'Continue' button if on last field of last tab within tabbed window
35. Tabbing will go onto the next editable field in the window
36. Banner style & size & display exact same as existing windows
37. If 8 or less options in a list box, display all options on open of list box - should be no need to scroll
38. Errors on continue will cause user to be returned to the tab and the focus should be on the field causing the error. (i.e the tab is opened, highlighting the field with the error on it)
39. Pressing continue while on the first tab of a tabbed window (assuming all fields filled correctly) will not open all the tabs.
40. On open of tab focus will be on first editable field
41. All fonts to be the same
42. Alt+F4 will close the tabbed window and return you to main screen or previous screen (as appropriate), generating "changes will be lost" message if necessary.
43. Microhelp text for every enabled field & button
44. Ensure all fields are disabled in read-only mode
45. Progress messages on load of tabbed screens
46. Return operates continue
47. If retrieve on load of tabbed window fails window should not open
Windows Compliance Testing
1.Application
Start Application by Double Clicking on its ICON. The Loading message should show the application name, version number, and a bigger pictorial representation of the icon. No Login is necessary. The main window of the application should have the same caption as the caption of the icon in Program Manager. Closing the application should result in an "Are you Sure" message box Attempt to start application twice. This should not be allowed - you should be returned to main window. Try to start the application twice as it is loading. On each window, if the application is busy, then the hour glass should be displayed. If there is no hour glass, then some enquiry in progress message should be displayed. All screens should have a Help button (i.e.) F1 key should work the same.
If Window has a Minimize Button, click it. Window should return to an icon on the bottom of the screen. This icon should correspond to the Original Icon under Program Manager. Double Click the Icon to return the Window to its original size. The window caption for every application should have the name of the application and the window name - especially the error messages. These should be checked for spelling, English and clarity, especially on the top of the screen. Check does the title of the window make sense. If the screen has a Control menu, then use all un-grayed options.
Check all text on window for Spelling/Tense and Grammar.
Use TAB to move focus around the Window. Use SHIFT+TAB to move focus backwards. Tab order should be left to right, and Up to Down within a group box on the screen. All controls should get focus - indicated by dotted box, or cursor. Tabbing to an entry field with text in it should highlight the entire text in the field. The text in the Micro Help line should change - Check for spelling, clarity and non-updateable etc. If a field is disabled (grayed) then it should not get focus. It should not be possible to select them with either the mouse or by using TAB. Try this for every grayed control.
Never updateable fields should be displayed with black text on a gray background with a black label. All text should be left justified, followed by a colon tight to it. In a field that may or may not be updateable, the label text and contents changes from black to gray depending on the current status. List boxes are always white background with black text whether they are disabled or not. All others are gray.
In general, double-clicking is not essential. In general, everything can be done using both the mouse and the keyboard. All tab buttons should have a distinct letter.
2.Text Boxes
Move the Mouse Cursor over all Enterable Text Boxes. Cursor should change from arrow to Insert Bar. If it doesn't then the text in the box should be gray or non-updateable. Refer to previous page. Enter text into Box Try to overflow the text by typing to many characters - should be stopped Check the field width with capitals W. Enter invalid characters - Letters in amount fields, try strange characters like + , - * etc. in All fields. SHIFT and Arrow should Select Characters. Selection should also be possible with mouse. Double Click should select all text in box.
3.Option (Radio Buttons)
Left and Right arrows should move 'ON' Selection. So should Up and Down. Select with mouse by clicking.
4.Check Boxes
Clicking with the mouse on the box, or on the text should SET/UNSET the box. SPACE should do the same.
5.Command Buttons
If Command Button leads to another Screen, and if the user can enter or change details on the other screen then the Text on the button should be followed by three dots. All Buttons except for OK and Cancel should have a letter Access to them. This is indicated by a letter underlined in the button text. Pressing ALT+Letter should activate the button. Make sure there is no duplication. Click each button once with the mouse - This should activate Tab to each button - Press SPACE - This should activate
Tab to each button - Press RETURN - This should activate The above are VERY IMPORTANT, and should be done for EVERY command Button. Tab to another type of control (not a command button). One button on the screen should be default (indicated by a thick black border). Pressing Return in ANY no command button control should activate it.
If there is a Cancel Button on the screen, then pressing should activate it. If pressing the Command button results in uncorrectable data e.g. closing an action step, there should be a message phrased positively with Yes/No answers where Yes results in the completion of the action.
6.Drop Down List Boxes
Pressing the Arrow should give list of options. This List may be scrollable. You should not be able to type text in the box. Pressing a letter should bring you to the first item in the list with that start with that letter. Pressing ‘Ctrl - F4’ should open/drop down the list box. Spacing should be compatible with the existing windows spacing (word etc.). Items should be in alphabetical order with the exception of blank/none, which is at the top or the bottom of the list box. Drop down with the item selected should be display the list with the selected item on the top. Make sure only one space appears, shouldn't have a blank line at the bottom.
7.Combo Boxes
Should allow text to be entered. Clicking Arrow should allow user to choose from list.
8. List Boxes
Should allow a single selection to be chosen, by clicking with the mouse, or using the Up and Down Arrow keys. Pressing a letter should take you to the first item in the list starting with that letter. If there is a 'View' or 'Open' button besides the list box then double clicking on a line in the List Box, should act in the same way as selecting and item in the list box, then clicking the command button. Force the scroll bar to appear, make sure all the data can be seen in the box.
Start Application by Double Clicking on its ICON. The Loading message should show the application name, version number, and a bigger pictorial representation of the icon. No Login is necessary. The main window of the application should have the same caption as the caption of the icon in Program Manager. Closing the application should result in an "Are you Sure" message box Attempt to start application twice. This should not be allowed - you should be returned to main window. Try to start the application twice as it is loading. On each window, if the application is busy, then the hour glass should be displayed. If there is no hour glass, then some enquiry in progress message should be displayed. All screens should have a Help button (i.e.) F1 key should work the same.
If Window has a Minimize Button, click it. Window should return to an icon on the bottom of the screen. This icon should correspond to the Original Icon under Program Manager. Double Click the Icon to return the Window to its original size. The window caption for every application should have the name of the application and the window name - especially the error messages. These should be checked for spelling, English and clarity, especially on the top of the screen. Check does the title of the window make sense. If the screen has a Control menu, then use all un-grayed options.
Check all text on window for Spelling/Tense and Grammar.
Use TAB to move focus around the Window. Use SHIFT+TAB to move focus backwards. Tab order should be left to right, and Up to Down within a group box on the screen. All controls should get focus - indicated by dotted box, or cursor. Tabbing to an entry field with text in it should highlight the entire text in the field. The text in the Micro Help line should change - Check for spelling, clarity and non-updateable etc. If a field is disabled (grayed) then it should not get focus. It should not be possible to select them with either the mouse or by using TAB. Try this for every grayed control.
Never updateable fields should be displayed with black text on a gray background with a black label. All text should be left justified, followed by a colon tight to it. In a field that may or may not be updateable, the label text and contents changes from black to gray depending on the current status. List boxes are always white background with black text whether they are disabled or not. All others are gray.
In general, double-clicking is not essential. In general, everything can be done using both the mouse and the keyboard. All tab buttons should have a distinct letter.
2.Text Boxes
Move the Mouse Cursor over all Enterable Text Boxes. Cursor should change from arrow to Insert Bar. If it doesn't then the text in the box should be gray or non-updateable. Refer to previous page. Enter text into Box Try to overflow the text by typing to many characters - should be stopped Check the field width with capitals W. Enter invalid characters - Letters in amount fields, try strange characters like + , - * etc. in All fields. SHIFT and Arrow should Select Characters. Selection should also be possible with mouse. Double Click should select all text in box.
3.Option (Radio Buttons)
Left and Right arrows should move 'ON' Selection. So should Up and Down. Select with mouse by clicking.
4.Check Boxes
Clicking with the mouse on the box, or on the text should SET/UNSET the box. SPACE should do the same.
5.Command Buttons
If Command Button leads to another Screen, and if the user can enter or change details on the other screen then the Text on the button should be followed by three dots. All Buttons except for OK and Cancel should have a letter Access to them. This is indicated by a letter underlined in the button text. Pressing ALT+Letter should activate the button. Make sure there is no duplication. Click each button once with the mouse - This should activate Tab to each button - Press SPACE - This should activate
Tab to each button - Press RETURN - This should activate The above are VERY IMPORTANT, and should be done for EVERY command Button. Tab to another type of control (not a command button). One button on the screen should be default (indicated by a thick black border). Pressing Return in ANY no command button control should activate it.
If there is a Cancel Button on the screen, then pressing
6.Drop Down List Boxes
Pressing the Arrow should give list of options. This List may be scrollable. You should not be able to type text in the box. Pressing a letter should bring you to the first item in the list with that start with that letter. Pressing ‘Ctrl - F4’ should open/drop down the list box. Spacing should be compatible with the existing windows spacing (word etc.). Items should be in alphabetical order with the exception of blank/none, which is at the top or the bottom of the list box. Drop down with the item selected should be display the list with the selected item on the top. Make sure only one space appears, shouldn't have a blank line at the bottom.
7.Combo Boxes
Should allow text to be entered. Clicking Arrow should allow user to choose from list.
8. List Boxes
Should allow a single selection to be chosen, by clicking with the mouse, or using the Up and Down Arrow keys. Pressing a letter should take you to the first item in the list starting with that letter. If there is a 'View' or 'Open' button besides the list box then double clicking on a line in the List Box, should act in the same way as selecting and item in the list box, then clicking the command button. Force the scroll bar to appear, make sure all the data can be seen in the box.
GUI Testing
What is GUI Testing?
GUI is the abbreviation for Graphic User Interface. It is absolutely essential that any application has to be user-friendly. The end user should be comfortable while using all the components on screen and the components should also perform their functionality with utmost clarity. Hence it becomes very essential to test the GUI components of any application. GUI Testing can refer to just ensuring that the look-and-feel of the application is acceptable to the user, or it can refer to testing the functionality of each and every component involved.
The following is a set of guidelines to ensure effective GUI Testing and can be used even as a checklist while testing a product / application.
Sections Of GUI Testing:
1.Windows Compliance Testing
2.Screen Validation Checklist
3.Specific Field Tests
4.Validation Testing - Standard Actions
GUI is the abbreviation for Graphic User Interface. It is absolutely essential that any application has to be user-friendly. The end user should be comfortable while using all the components on screen and the components should also perform their functionality with utmost clarity. Hence it becomes very essential to test the GUI components of any application. GUI Testing can refer to just ensuring that the look-and-feel of the application is acceptable to the user, or it can refer to testing the functionality of each and every component involved.
The following is a set of guidelines to ensure effective GUI Testing and can be used even as a checklist while testing a product / application.
Sections Of GUI Testing:
1.Windows Compliance Testing
2.Screen Validation Checklist
3.Specific Field Tests
4.Validation Testing - Standard Actions
Monday, July 7, 2008
Verification Strategies
What is ‘Verification’?
Verification is the process of evaluating a system or component to determine whether the products of a given development phase satisfy the conditions imposed at the start of that phase.
What is the importance of the Verification Phase?
Verification process helps in detecting defects early, and preventing their leakage downstream. Thus, the higher cost of later detection and rework is eliminated.
1. Review
A process or meeting during which a work product, or set of work products, is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
The main goal of reviews is to find defects. Reviews are a good compliment to testing to help assure quality. A few purposes’ of SQA reviews can be as follows:
• Assure the quality of deliverable before the project moves to the next stage.
• Once a deliverable has been reviewed, revised as required, and approved, it can be used as a basis for the next stage in the life cycle.
What are the various types of reviews?
Types of reviews include Management Reviews, Technical Reviews, Inspections, Walkthroughs and Audits.
Management Reviews
Management reviews are performed by those directly responsible for the system in order to monitor progress, determine status of plans and schedules, confirm requirements and their system allocation.
Therefore the main objectives of Management Reviews can be categorized as follows:
• Validate from a management perspective that the project is making progress according to the project plan.
• Ensure that deliverables are ready for management approvals.
• Resolve issues that require management’s attention.
• Identify any project bottlenecks.
• Keeping project in Control.
Support decisions made during such reviews include Corrective actions, Changes in the allocation of resources or changes to the scope of the project
In management reviews the following Software products are reviewed:
Audit Reports
Contingency plans
Installation plans
Risk management plans
Software Q/A
The participants of the review play the roles of Decision-Maker, Review Leader, Recorder, Management Staff, and Technical Staff.
Technical Reviews
Technical reviews confirm that product Conforms to specifications, adheres to regulations, standards, guidelines, plans, changes are properly implemented, changes affect only those system areas identified by the change specification.
The main objectives of Technical Reviews can be categorized as follows:
• Ensure that the software confirms to the organization standards.
• Ensure that any changes in the development procedures (design, coding, testing) are implemented per the organization pre-defined standards.
In technical reviews, the following Software products are reviewed
• Software requirements specification
• Software design description
• Software test documentation
• Software user documentation
• Installation procedure
• Release notes
The participants of the review play the roles of Decision-maker, Review leader, Recorder, Technical staff.
What is Requirement Review?
A process or meeting during which the requirements for a system, hardware item, or software item are presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include system requirements review, software requirements review.
Who is involved in Requirement Review?
• Product management leads Requirement Review. Members from every affected department participates in the review
Input Criteria
Software requirement specification is the essential document for the review. A checklist can be used for the review.
Exit Criteria
Exit criteria include the filled & completed checklist with the reviewers’ comments & suggestions and the re-verification whether they are incorporated in the documents.
What is Design Review?
A process or meeting during which a system, hardware, or software design is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include critical design review, preliminary design review, and system design review.
Who involve in Design Review?
• QA team member leads design review. Members from development team and QA team participate in the review.
Input Criteria
Design document is the essential document for the review. A checklist can be used for the review.
Exit Criteria
Exit criteria include the filled & completed checklist with the reviewers’ comments & suggestions and the re-verification whether they are incorporated in the documents.
What is Code Review?
A meeting at which software code is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
Who is involved in Code Review?
• QA team member (In case the QA Team is only involved in Black Box Testing, then the Development team lead chairs the review team) leads code review. Members from development team and QA team participate in the review.
Input Criteria
The Coding Standards Document and the Source file are the essential documents for the review. A checklist can be used for the review.
Exit Criteria
Exit criteria include the filled & completed checklist with the reviewers’ comments & suggestions and the re-verification whether they are incorporated in the documents.
2. Walkthrough
A static analysis technique in which a designer or programmer leads members of the development team and other interested parties through a segment of documentation or code, and the participants ask questions and make comments about possible errors, violation of development standards, and other problems.
The objectives of Walkthrough can be summarized as follows:
• Detect errors early.
• Ensure (re)established standards are followed:
• Train and exchange technical information among project teams which participate in the walkthrough.
• Increase the quality of the project, thereby improving morale of the team members.
The participants in Walkthroughs assume one or more of the following roles:
a) Walk-through leader
b) Recorder
c) Author
d) Team member
To consider a review as a systematic walk-through, a team of at least two members shall be assembled. Roles may be shared among the team members. The walk-through leader or the author may serve as the recorder. The walk-through leader may be the author.
Individuals holding management positions over any member of the walk-through team shall not participate in the walk-through.
Input to the walk-through shall include the following:
a) A statement of objectives for the walk-through
b) The software product being examined
c) Standards that are in effect for the acquisition, supply, development, operation, and/or maintenance of the software product
Input to the walk-through may also include the following:
d) Any regulations, standards, guidelines, plans, and procedures against which the software product is to be inspected
e) Anomaly categories
The walk-through shall be considered complete when
a) The entire software product has been examined
b) Recommendations and required actions have been recorded
c) The walk-through output has been completed
3. Inspection
A static analysis technique that relies on visual examination of development products to detect errors, violations of development standards, and other problems. Types include code inspection; design inspection, Architectural inspections, Test ware inspections etc.
The participants in Inspections assume one or more of the following roles:
a) Inspection leader
b) Recorder
c) Reader
d) Author
e) Inspector
All participants in the review are inspectors. The author shall not act as inspection leader and should not act as reader or recorder. Other roles may be shared among the team members. Individual participants may act in more than one role.
Individuals holding management positions over any member of the inspection team shall not participate in the inspection.
Input to the inspection shall include the following:
a) A statement of objectives for the inspection
b) The software product to be inspected
c) Documented inspection procedure
d) Inspection reporting forms
e) Current anomalies or issues list
Input to the inspection may also include the following:
f) Inspection checklists
g) Any regulations, standards, guidelines, plans, and procedures against which the software product is to be inspected
h) Hardware product specifications
i) Hardware performance data
j) Anomaly categories
The individuals may make additional reference material available responsible for the software product when requested by the inspection leader.
The purpose of the exit criteria is to bring an unambiguous closure to the inspection meeting. The exit decision shall determine if the software product meets the inspection exit criteria and shall prescribe any appropriate rework and verification. Specifically, the inspection team shall identify the software product disposition as one of the following:
a) Accept with no or minor rework. The software product is accepted as is or with only minor rework. (For example, that would require no further verification).
b) Accept with rework verification. The software product is to be accepted after the inspection leader or
a designated member of the inspection team (other than the author) verifies rework.
c) Re-inspect. Schedule a re-inspection to verify rework. At a minimum, a re-inspection shall examine the software product areas changed to resolve anomalies identified in the last inspection, as well as side effects of those changes.
Verification is the process of evaluating a system or component to determine whether the products of a given development phase satisfy the conditions imposed at the start of that phase.
What is the importance of the Verification Phase?
Verification process helps in detecting defects early, and preventing their leakage downstream. Thus, the higher cost of later detection and rework is eliminated.
1. Review
A process or meeting during which a work product, or set of work products, is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
The main goal of reviews is to find defects. Reviews are a good compliment to testing to help assure quality. A few purposes’ of SQA reviews can be as follows:
• Assure the quality of deliverable before the project moves to the next stage.
• Once a deliverable has been reviewed, revised as required, and approved, it can be used as a basis for the next stage in the life cycle.
What are the various types of reviews?
Types of reviews include Management Reviews, Technical Reviews, Inspections, Walkthroughs and Audits.
Management Reviews
Management reviews are performed by those directly responsible for the system in order to monitor progress, determine status of plans and schedules, confirm requirements and their system allocation.
Therefore the main objectives of Management Reviews can be categorized as follows:
• Validate from a management perspective that the project is making progress according to the project plan.
• Ensure that deliverables are ready for management approvals.
• Resolve issues that require management’s attention.
• Identify any project bottlenecks.
• Keeping project in Control.
Support decisions made during such reviews include Corrective actions, Changes in the allocation of resources or changes to the scope of the project
In management reviews the following Software products are reviewed:
Audit Reports
Contingency plans
Installation plans
Risk management plans
Software Q/A
The participants of the review play the roles of Decision-Maker, Review Leader, Recorder, Management Staff, and Technical Staff.
Technical Reviews
Technical reviews confirm that product Conforms to specifications, adheres to regulations, standards, guidelines, plans, changes are properly implemented, changes affect only those system areas identified by the change specification.
The main objectives of Technical Reviews can be categorized as follows:
• Ensure that the software confirms to the organization standards.
• Ensure that any changes in the development procedures (design, coding, testing) are implemented per the organization pre-defined standards.
In technical reviews, the following Software products are reviewed
• Software requirements specification
• Software design description
• Software test documentation
• Software user documentation
• Installation procedure
• Release notes
The participants of the review play the roles of Decision-maker, Review leader, Recorder, Technical staff.
What is Requirement Review?
A process or meeting during which the requirements for a system, hardware item, or software item are presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include system requirements review, software requirements review.
Who is involved in Requirement Review?
• Product management leads Requirement Review. Members from every affected department participates in the review
Input Criteria
Software requirement specification is the essential document for the review. A checklist can be used for the review.
Exit Criteria
Exit criteria include the filled & completed checklist with the reviewers’ comments & suggestions and the re-verification whether they are incorporated in the documents.
What is Design Review?
A process or meeting during which a system, hardware, or software design is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include critical design review, preliminary design review, and system design review.
Who involve in Design Review?
• QA team member leads design review. Members from development team and QA team participate in the review.
Input Criteria
Design document is the essential document for the review. A checklist can be used for the review.
Exit Criteria
Exit criteria include the filled & completed checklist with the reviewers’ comments & suggestions and the re-verification whether they are incorporated in the documents.
What is Code Review?
A meeting at which software code is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
Who is involved in Code Review?
• QA team member (In case the QA Team is only involved in Black Box Testing, then the Development team lead chairs the review team) leads code review. Members from development team and QA team participate in the review.
Input Criteria
The Coding Standards Document and the Source file are the essential documents for the review. A checklist can be used for the review.
Exit Criteria
Exit criteria include the filled & completed checklist with the reviewers’ comments & suggestions and the re-verification whether they are incorporated in the documents.
2. Walkthrough
A static analysis technique in which a designer or programmer leads members of the development team and other interested parties through a segment of documentation or code, and the participants ask questions and make comments about possible errors, violation of development standards, and other problems.
The objectives of Walkthrough can be summarized as follows:
• Detect errors early.
• Ensure (re)established standards are followed:
• Train and exchange technical information among project teams which participate in the walkthrough.
• Increase the quality of the project, thereby improving morale of the team members.
The participants in Walkthroughs assume one or more of the following roles:
a) Walk-through leader
b) Recorder
c) Author
d) Team member
To consider a review as a systematic walk-through, a team of at least two members shall be assembled. Roles may be shared among the team members. The walk-through leader or the author may serve as the recorder. The walk-through leader may be the author.
Individuals holding management positions over any member of the walk-through team shall not participate in the walk-through.
Input to the walk-through shall include the following:
a) A statement of objectives for the walk-through
b) The software product being examined
c) Standards that are in effect for the acquisition, supply, development, operation, and/or maintenance of the software product
Input to the walk-through may also include the following:
d) Any regulations, standards, guidelines, plans, and procedures against which the software product is to be inspected
e) Anomaly categories
The walk-through shall be considered complete when
a) The entire software product has been examined
b) Recommendations and required actions have been recorded
c) The walk-through output has been completed
3. Inspection
A static analysis technique that relies on visual examination of development products to detect errors, violations of development standards, and other problems. Types include code inspection; design inspection, Architectural inspections, Test ware inspections etc.
The participants in Inspections assume one or more of the following roles:
a) Inspection leader
b) Recorder
c) Reader
d) Author
e) Inspector
All participants in the review are inspectors. The author shall not act as inspection leader and should not act as reader or recorder. Other roles may be shared among the team members. Individual participants may act in more than one role.
Individuals holding management positions over any member of the inspection team shall not participate in the inspection.
Input to the inspection shall include the following:
a) A statement of objectives for the inspection
b) The software product to be inspected
c) Documented inspection procedure
d) Inspection reporting forms
e) Current anomalies or issues list
Input to the inspection may also include the following:
f) Inspection checklists
g) Any regulations, standards, guidelines, plans, and procedures against which the software product is to be inspected
h) Hardware product specifications
i) Hardware performance data
j) Anomaly categories
The individuals may make additional reference material available responsible for the software product when requested by the inspection leader.
The purpose of the exit criteria is to bring an unambiguous closure to the inspection meeting. The exit decision shall determine if the software product meets the inspection exit criteria and shall prescribe any appropriate rework and verification. Specifically, the inspection team shall identify the software product disposition as one of the following:
a) Accept with no or minor rework. The software product is accepted as is or with only minor rework. (For example, that would require no further verification).
b) Accept with rework verification. The software product is to be accepted after the inspection leader or
a designated member of the inspection team (other than the author) verifies rework.
c) Re-inspect. Schedule a re-inspection to verify rework. At a minimum, a re-inspection shall examine the software product areas changed to resolve anomalies identified in the last inspection, as well as side effects of those changes.
When should Testing stop?
"When to stop testing" is one of the most difficult questions to a test engineer.
The following are few of the common Test Stop criteria:
1. All the high priority bugs are fixed.
2. The rate at which bugs are found is too small.
3. The testing budget is exhausted.
4. The project duration is completed.
5. The risk in the project is under acceptable limit.
Practically, we feel that the decision of stopping testing is based on the level of the risk acceptable to the management. As testing is a never ending process we can never assume that 100 % testing has been done, we can only minimize the risk of shipping the product to client with X testing done. The risk can be measured by Risk analysis but for small duration / low budget / low resources project, risk can be deduced by simply: -
• Measuring Test Coverage.
• Number of test cycles.
• Number of high priority bugs.
The following are few of the common Test Stop criteria:
1. All the high priority bugs are fixed.
2. The rate at which bugs are found is too small.
3. The testing budget is exhausted.
4. The project duration is completed.
5. The risk in the project is under acceptable limit.
Practically, we feel that the decision of stopping testing is based on the level of the risk acceptable to the management. As testing is a never ending process we can never assume that 100 % testing has been done, we can only minimize the risk of shipping the product to client with X testing done. The risk can be measured by Risk analysis but for small duration / low budget / low resources project, risk can be deduced by simply: -
• Measuring Test Coverage.
• Number of test cycles.
• Number of high priority bugs.
Subscribe to: